/*******************************************************************************
* Copyright (c) 2005, 2009 IBM Corporation and others.
* All rights reserved. This program and the accompanying materials
* are made available under the terms of the Eclipse Public License v1.0
* which accompanies this distribution, and is available at
* http://www.eclipse.org/legal/epl-v10.html
*
* Contributors:
* IBM Corporation - initial implementation
*******************************************************************************/
package org.eclipse.epf.msproject.impl;
import java.io.IOException;
import java.net.URL;
import org.eclipse.emf.common.util.URI;
import org.eclipse.emf.common.util.WrappedException;
import org.eclipse.emf.ecore.EAttribute;
import org.eclipse.emf.ecore.EClass;
import org.eclipse.emf.ecore.EDataType;
import org.eclipse.emf.ecore.EPackage;
import org.eclipse.emf.ecore.EReference;
import org.eclipse.emf.ecore.EValidator;
import org.eclipse.emf.ecore.impl.EPackageImpl;
import org.eclipse.emf.ecore.resource.Resource;
import org.eclipse.emf.ecore.xmi.impl.EcoreResourceFactoryImpl;
import org.eclipse.emf.ecore.xml.type.impl.XMLTypePackageImpl;
import org.eclipse.epf.msproject.MsprojectFactory;
import org.eclipse.epf.msproject.MsprojectPackage;
import org.eclipse.epf.msproject.util.MsprojectValidator;
/**
* <!-- begin-user-doc -->
* An implementation of the model <b>Package</b>.
* <!-- end-user-doc -->
* @generated
*/
public class MsprojectPackageImpl extends EPackageImpl implements MsprojectPackage {
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
protected String packageFilename = "msproject.ecore";
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass assignmentEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass assignmentsEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass availabilityPeriodEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass availabilityPeriodsEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass baselineEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass baseline2EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass baseline3EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass calendarEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass calendarsEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass documentRootEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass extendedAttributeEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass extendedAttribute2EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass extendedAttribute3EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass extendedAttribute4EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass extendedAttributesEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass maskEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass masksEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass outlineCodeEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass outlineCode2EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass outlineCode3EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass outlineCodesEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass predecessorLinkEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass projectEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass rateEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass ratesEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass resourceEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass resourcesEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass taskEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass tasksEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass timePeriodEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass timephasedDataTypeEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass valueEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass value2EClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass valueListEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass valuesEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass wbsMaskEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass wbsMasksEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass weekDayEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass weekDaysEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass workingTimeEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EClass workingTimesEClass = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType accrueAtEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType activeDirectoryGUIDTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType aliasTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType authorTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType baselineForEarnedValueTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType bookingTypeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType bookingTypeType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType calculationTypeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType categoryTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType codeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType companyTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType constraintTypeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType contactTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType costRateTableTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType currencySymbolPositionTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType currencySymbolTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType dayTypeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType defaultFixedCostAccrualTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType defaultTaskEVMethodTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType defaultTaskTypeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType durationFormatTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType durationFormatType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType durationFormatType2EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType durationFormatType3EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType durationFormatType4EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType durationFormatType5EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType earnedValueMethodTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType earnedValueMethodType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType emailAddressTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType externalTaskProjectTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType fixedCostAccrualTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType fyStartDateTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType groupTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkAddressTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkAddressType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkAddressType2EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkSubAddressTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkSubAddressType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkSubAddressType2EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType hyperlinkType2EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType initialsTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType lagFormatTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType levelingDelayFormatTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType levelingDelayFormatType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType managerTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType materialLabelTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType nameTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType nameType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType nameType2EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType nameType3EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType newTaskStartDateTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType ntAccountTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType outlineNumberTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType overtimeRateFormatTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType overtimeRateFormatType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType phoneticAliasTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType phoneticsTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType prefixTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType rateTableTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType rollupTypeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType standardRateFormatTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType standardRateFormatType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType subjectTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType subprojectNameTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType titleTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType typeTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType typeType1EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType typeType2EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType typeType3EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType typeType4EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType typeType5EDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType uidTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType unitTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType valuelistSortOrderTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType weekStartDayTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType workContourTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType workFormatTypeEDataType = null;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private EDataType workGroupTypeEDataType = null;
/**
* Creates an instance of the model <b>Package</b>, registered with
* {@link org.eclipse.emf.ecore.EPackage.Registry EPackage.Registry} by the package
* package URI value.
* <p>Note: the correct way to create the package is via the static
* factory method {@link #init init()}, which also performs
* initialization of the package, or returns the registered package,
* if one already exists.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.emf.ecore.EPackage.Registry
* @see org.eclipse.epf.msproject.MsprojectPackage#eNS_URI
* @see #init()
* @generated
*/
private MsprojectPackageImpl() {
super(eNS_URI, MsprojectFactory.eINSTANCE);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private static boolean isInited = false;
/**
* Creates, registers, and initializes the <b>Package</b> for this
* model, and for any others upon which it depends. Simple
* dependencies are satisfied by calling this method on all
* dependent packages before doing anything else. This method drives
* initialization for interdependent packages directly, in parallel
* with this package, itself.
* <p>Of this package and its interdependencies, all packages which
* have not yet been registered by their URI values are first created
* and registered. The packages are then initialized in two steps:
* meta-model objects for all of the packages are created before any
* are initialized, since one package's meta-model objects may refer to
* those of another.
* <p>Invocation of this method will not affect any packages that have
* already been initialized.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #eNS_URI
* @generated
*/
public static MsprojectPackage init() {
if (isInited) return (MsprojectPackage)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI);
// Obtain or create and register package
MsprojectPackageImpl theMsprojectPackage = (MsprojectPackageImpl)(EPackage.Registry.INSTANCE.getEPackage(eNS_URI) instanceof MsprojectPackageImpl ? EPackage.Registry.INSTANCE.getEPackage(eNS_URI) : new MsprojectPackageImpl());
isInited = true;
// Initialize simple dependencies
XMLTypePackageImpl.init();
// Load packages
theMsprojectPackage.loadPackage();
// Fix loaded packages
theMsprojectPackage.fixPackageContents();
// Register package validator
EValidator.Registry.INSTANCE.put
(theMsprojectPackage,
new EValidator.Descriptor() {
public EValidator getEValidator() {
return MsprojectValidator.INSTANCE;
}
});
// Mark meta-data to indicate it can't be changed
theMsprojectPackage.freeze();
return theMsprojectPackage;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getAssignment() {
if (assignmentEClass == null) {
assignmentEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(3);
}
return assignmentEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_UID() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_TaskUID() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ResourceUID() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_PercentWorkComplete() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualCost() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualFinish() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualOvertimeCost() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualOvertimeWork() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualStart() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualWork() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ACWP() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Confirmed() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Cost() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(12);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_CostRateTable() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(13);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_CostVariance() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(14);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_CV() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(15);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Delay() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(16);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Finish() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(17);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_FinishVariance() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(18);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Hyperlink() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(19);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_HyperlinkAddress() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(20);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_HyperlinkSubAddress() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(21);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_WorkVariance() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(22);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_HasFixedRateUnits() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(23);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_FixedMaterial() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(24);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_LevelingDelay() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(25);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_LevelingDelayFormat() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(26);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_LinkedFields() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(27);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Milestone() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(28);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Notes() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(29);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Overallocated() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(30);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_OvertimeCost() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(31);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_OvertimeWork() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(32);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_RegularWork() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(33);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_RemainingCost() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(34);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_RemainingOvertimeCost() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(35);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_RemainingOvertimeWork() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(36);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_RemainingWork() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(37);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ResponsePending() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(38);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Start() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(39);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Stop() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(40);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Resume() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(41);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_StartVariance() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(42);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Units() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(43);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_UpdateNeeded() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(44);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_VAC() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(45);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_Work() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(46);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_WorkContour() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(47);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_BCWS() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(48);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_BCWP() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(49);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_BookingType() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(50);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualWorkProtected() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(51);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_ActualOvertimeWorkProtected() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(52);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAssignment_CreationDate() {
return (EAttribute)getAssignment().getEStructuralFeatures().get(53);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getAssignment_ExtendedAttribute() {
return (EReference)getAssignment().getEStructuralFeatures().get(54);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getAssignment_Baseline() {
return (EReference)getAssignment().getEStructuralFeatures().get(55);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getAssignment_TimephasedData() {
return (EReference)getAssignment().getEStructuralFeatures().get(56);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getAssignments() {
if (assignmentsEClass == null) {
assignmentsEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(4);
}
return assignmentsEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getAssignments_Assignment() {
return (EReference)getAssignments().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getAvailabilityPeriod() {
if (availabilityPeriodEClass == null) {
availabilityPeriodEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(6);
}
return availabilityPeriodEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAvailabilityPeriod_AvailableFrom() {
return (EAttribute)getAvailabilityPeriod().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAvailabilityPeriod_AvailableTo() {
return (EAttribute)getAvailabilityPeriod().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getAvailabilityPeriod_AvailableUnits() {
return (EAttribute)getAvailabilityPeriod().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getAvailabilityPeriods() {
if (availabilityPeriodsEClass == null) {
availabilityPeriodsEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(7);
}
return availabilityPeriodsEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getAvailabilityPeriods_AvailabilityPeriod() {
return (EReference)getAvailabilityPeriods().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getBaseline() {
if (baselineEClass == null) {
baselineEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(8);
}
return baselineEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getBaseline_TimephasedData() {
return (EReference)getBaseline().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Number() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Interim() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Start() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Finish() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Duration() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_DurationFormat() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_EstimatedDuration() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Work() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_Cost() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_BCWS() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline_BCWP() {
return (EAttribute)getBaseline().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getBaseline2() {
if (baseline2EClass == null) {
baseline2EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(9);
}
return baseline2EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline2_Number() {
return (EAttribute)getBaseline2().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline2_Work() {
return (EAttribute)getBaseline2().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline2_Cost() {
return (EAttribute)getBaseline2().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline2_BCWS() {
return (EAttribute)getBaseline2().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline2_BCWP() {
return (EAttribute)getBaseline2().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getBaseline3() {
if (baseline3EClass == null) {
baseline3EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(10);
}
return baseline3EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getBaseline3_TimephasedData() {
return (EReference)getBaseline3().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_Number() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_Start() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_Finish() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_Work() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_Cost() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_BCWS() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getBaseline3_BCWP() {
return (EAttribute)getBaseline3().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getCalendar() {
if (calendarEClass == null) {
calendarEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(15);
}
return calendarEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getCalendar_UID() {
return (EAttribute)getCalendar().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getCalendar_Name() {
return (EAttribute)getCalendar().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getCalendar_IsBaseCalendar() {
return (EAttribute)getCalendar().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getCalendar_BaseCalendarUID() {
return (EAttribute)getCalendar().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getCalendar_WeekDays() {
return (EReference)getCalendar().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getCalendars() {
if (calendarsEClass == null) {
calendarsEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(16);
}
return calendarsEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getCalendars_Calendar() {
return (EReference)getCalendars().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getDocumentRoot() {
if (documentRootEClass == null) {
documentRootEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(29);
}
return documentRootEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getDocumentRoot_Mixed() {
return (EAttribute)getDocumentRoot().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getDocumentRoot_XMLNSPrefixMap() {
return (EReference)getDocumentRoot().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getDocumentRoot_XSISchemaLocation() {
return (EReference)getDocumentRoot().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getDocumentRoot_Project() {
return (EReference)getDocumentRoot().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getExtendedAttribute() {
if (extendedAttributeEClass == null) {
extendedAttributeEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(39);
}
return extendedAttributeEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_FieldID() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_FieldName() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_Alias() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_PhoneticAlias() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_RollupType() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_CalculationType() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_Formula() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_RestrictValues() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_ValuelistSortOrder() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_AppendNewValues() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute_Default() {
return (EAttribute)getExtendedAttribute().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getExtendedAttribute_ValueList() {
return (EReference)getExtendedAttribute().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getExtendedAttribute2() {
if (extendedAttribute2EClass == null) {
extendedAttribute2EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(40);
}
return extendedAttribute2EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute2_UID() {
return (EAttribute)getExtendedAttribute2().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute2_FieldID() {
return (EAttribute)getExtendedAttribute2().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute2_Value() {
return (EAttribute)getExtendedAttribute2().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute2_ValueID() {
return (EAttribute)getExtendedAttribute2().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute2_DurationFormat() {
return (EAttribute)getExtendedAttribute2().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getExtendedAttribute3() {
if (extendedAttribute3EClass == null) {
extendedAttribute3EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(41);
}
return extendedAttribute3EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute3_UID() {
return (EAttribute)getExtendedAttribute3().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute3_FieldID() {
return (EAttribute)getExtendedAttribute3().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute3_Value() {
return (EAttribute)getExtendedAttribute3().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute3_ValueID() {
return (EAttribute)getExtendedAttribute3().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute3_DurationFormat() {
return (EAttribute)getExtendedAttribute3().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getExtendedAttribute4() {
if (extendedAttribute4EClass == null) {
extendedAttribute4EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(42);
}
return extendedAttribute4EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute4_UID() {
return (EAttribute)getExtendedAttribute4().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute4_FieldID() {
return (EAttribute)getExtendedAttribute4().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute4_Value() {
return (EAttribute)getExtendedAttribute4().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute4_ValueID() {
return (EAttribute)getExtendedAttribute4().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getExtendedAttribute4_DurationFormat() {
return (EAttribute)getExtendedAttribute4().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getExtendedAttributes() {
if (extendedAttributesEClass == null) {
extendedAttributesEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(43);
}
return extendedAttributesEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getExtendedAttributes_ExtendedAttribute() {
return (EReference)getExtendedAttributes().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getMask() {
if (maskEClass == null) {
maskEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(62);
}
return maskEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getMask_Level() {
return (EAttribute)getMask().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getMask_Type() {
return (EAttribute)getMask().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getMask_Length() {
return (EAttribute)getMask().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getMask_Separator() {
return (EAttribute)getMask().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getMasks() {
if (masksEClass == null) {
masksEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(63);
}
return masksEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getMasks_Mask() {
return (EReference)getMasks().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getOutlineCode() {
if (outlineCodeEClass == null) {
outlineCodeEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(71);
}
return outlineCodeEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_FieldID() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_FieldName() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_Alias() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_PhoneticAlias() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getOutlineCode_Values() {
return (EReference)getOutlineCode().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_Enterprise() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_EnterpriseOutlineCodeAlias() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_ResourceSubstitutionEnabled() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_LeafOnly() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_AllLevelsRequired() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode_OnlyTableValuesAllowed() {
return (EAttribute)getOutlineCode().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getOutlineCode_Masks() {
return (EReference)getOutlineCode().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getOutlineCode2() {
if (outlineCode2EClass == null) {
outlineCode2EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(72);
}
return outlineCode2EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode2_UID() {
return (EAttribute)getOutlineCode2().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode2_FieldID() {
return (EAttribute)getOutlineCode2().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode2_ValueID() {
return (EAttribute)getOutlineCode2().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getOutlineCode3() {
if (outlineCode3EClass == null) {
outlineCode3EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(73);
}
return outlineCode3EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode3_UID() {
return (EAttribute)getOutlineCode3().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode3_FieldID() {
return (EAttribute)getOutlineCode3().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getOutlineCode3_ValueID() {
return (EAttribute)getOutlineCode3().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getOutlineCodes() {
if (outlineCodesEClass == null) {
outlineCodesEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(74);
}
return outlineCodesEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getOutlineCodes_OutlineCode() {
return (EReference)getOutlineCodes().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getPredecessorLink() {
if (predecessorLinkEClass == null) {
predecessorLinkEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(80);
}
return predecessorLinkEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getPredecessorLink_PredecessorUID() {
return (EAttribute)getPredecessorLink().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getPredecessorLink_Type() {
return (EAttribute)getPredecessorLink().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getPredecessorLink_CrossProject() {
return (EAttribute)getPredecessorLink().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getPredecessorLink_CrossProjectName() {
return (EAttribute)getPredecessorLink().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getPredecessorLink_LinkLag() {
return (EAttribute)getPredecessorLink().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getPredecessorLink_LagFormat() {
return (EAttribute)getPredecessorLink().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getProject() {
if (projectEClass == null) {
projectEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(82);
}
return projectEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_UID() {
return (EAttribute)getProject().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Name() {
return (EAttribute)getProject().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Title() {
return (EAttribute)getProject().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Subject() {
return (EAttribute)getProject().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Category() {
return (EAttribute)getProject().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Company() {
return (EAttribute)getProject().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Manager() {
return (EAttribute)getProject().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Author() {
return (EAttribute)getProject().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CreationDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Revision() {
return (EAttribute)getProject().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_LastSaved() {
return (EAttribute)getProject().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_ScheduleFromStart() {
return (EAttribute)getProject().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_StartDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(12);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_FinishDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(13);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_FYStartDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(14);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CriticalSlackLimit() {
return (EAttribute)getProject().getEStructuralFeatures().get(15);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CurrencyDigits() {
return (EAttribute)getProject().getEStructuralFeatures().get(16);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CurrencySymbol() {
return (EAttribute)getProject().getEStructuralFeatures().get(17);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CurrencySymbolPosition() {
return (EAttribute)getProject().getEStructuralFeatures().get(18);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CalendarUID() {
return (EAttribute)getProject().getEStructuralFeatures().get(19);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultStartTime() {
return (EAttribute)getProject().getEStructuralFeatures().get(20);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultFinishTime() {
return (EAttribute)getProject().getEStructuralFeatures().get(21);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MinutesPerDay() {
return (EAttribute)getProject().getEStructuralFeatures().get(22);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MinutesPerWeek() {
return (EAttribute)getProject().getEStructuralFeatures().get(23);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DaysPerMonth() {
return (EAttribute)getProject().getEStructuralFeatures().get(24);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultTaskType() {
return (EAttribute)getProject().getEStructuralFeatures().get(25);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultFixedCostAccrual() {
return (EAttribute)getProject().getEStructuralFeatures().get(26);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultStandardRate() {
return (EAttribute)getProject().getEStructuralFeatures().get(27);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultOvertimeRate() {
return (EAttribute)getProject().getEStructuralFeatures().get(28);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DurationFormat() {
return (EAttribute)getProject().getEStructuralFeatures().get(29);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_WorkFormat() {
return (EAttribute)getProject().getEStructuralFeatures().get(30);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_EditableActualCosts() {
return (EAttribute)getProject().getEStructuralFeatures().get(31);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_HonorConstraints() {
return (EAttribute)getProject().getEStructuralFeatures().get(32);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_EarnedValueMethod() {
return (EAttribute)getProject().getEStructuralFeatures().get(33);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_InsertedProjectsLikeSummary() {
return (EAttribute)getProject().getEStructuralFeatures().get(34);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MultipleCriticalPaths() {
return (EAttribute)getProject().getEStructuralFeatures().get(35);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_NewTasksEffortDriven() {
return (EAttribute)getProject().getEStructuralFeatures().get(36);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_NewTasksEstimated() {
return (EAttribute)getProject().getEStructuralFeatures().get(37);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_SplitsInProgressTasks() {
return (EAttribute)getProject().getEStructuralFeatures().get(38);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_SpreadActualCost() {
return (EAttribute)getProject().getEStructuralFeatures().get(39);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_SpreadPercentComplete() {
return (EAttribute)getProject().getEStructuralFeatures().get(40);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_TaskUpdatesResource() {
return (EAttribute)getProject().getEStructuralFeatures().get(41);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_FiscalYearStart() {
return (EAttribute)getProject().getEStructuralFeatures().get(42);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_WeekStartDay() {
return (EAttribute)getProject().getEStructuralFeatures().get(43);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MoveCompletedEndsBack() {
return (EAttribute)getProject().getEStructuralFeatures().get(44);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MoveRemainingStartsBack() {
return (EAttribute)getProject().getEStructuralFeatures().get(45);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MoveRemainingStartsForward() {
return (EAttribute)getProject().getEStructuralFeatures().get(46);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MoveCompletedEndsForward() {
return (EAttribute)getProject().getEStructuralFeatures().get(47);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_BaselineForEarnedValue() {
return (EAttribute)getProject().getEStructuralFeatures().get(48);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_AutoAddNewResourcesAndTasks() {
return (EAttribute)getProject().getEStructuralFeatures().get(49);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_StatusDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(50);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_CurrentDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(51);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_MicrosoftProjectServerURL() {
return (EAttribute)getProject().getEStructuralFeatures().get(52);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_Autolink() {
return (EAttribute)getProject().getEStructuralFeatures().get(53);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_NewTaskStartDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(54);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_DefaultTaskEVMethod() {
return (EAttribute)getProject().getEStructuralFeatures().get(55);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_ProjectExternallyEdited() {
return (EAttribute)getProject().getEStructuralFeatures().get(56);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_ExtendedCreationDate() {
return (EAttribute)getProject().getEStructuralFeatures().get(57);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_ActualsInSync() {
return (EAttribute)getProject().getEStructuralFeatures().get(58);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_RemoveFileProperties() {
return (EAttribute)getProject().getEStructuralFeatures().get(59);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getProject_AdminProject() {
return (EAttribute)getProject().getEStructuralFeatures().get(60);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_OutlineCodes() {
return (EReference)getProject().getEStructuralFeatures().get(61);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_WBSMasks() {
return (EReference)getProject().getEStructuralFeatures().get(62);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_ExtendedAttributes() {
return (EReference)getProject().getEStructuralFeatures().get(63);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_Calendars() {
return (EReference)getProject().getEStructuralFeatures().get(64);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_Tasks() {
return (EReference)getProject().getEStructuralFeatures().get(65);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_Resources() {
return (EReference)getProject().getEStructuralFeatures().get(66);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getProject_Assignments() {
return (EReference)getProject().getEStructuralFeatures().get(67);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getRate() {
if (rateEClass == null) {
rateEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(83);
}
return rateEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_RatesFrom() {
return (EAttribute)getRate().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_RatesTo() {
return (EAttribute)getRate().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_RateTable() {
return (EAttribute)getRate().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_StandardRate() {
return (EAttribute)getRate().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_StandardRateFormat() {
return (EAttribute)getRate().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_OvertimeRate() {
return (EAttribute)getRate().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_OvertimeRateFormat() {
return (EAttribute)getRate().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getRate_CostPerUse() {
return (EAttribute)getRate().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getRates() {
if (ratesEClass == null) {
ratesEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(84);
}
return ratesEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getRates_Rate() {
return (EReference)getRates().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getResource() {
if (resourceEClass == null) {
resourceEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(86);
}
return resourceEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_UID() {
return (EAttribute)getResource().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ID() {
return (EAttribute)getResource().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Name() {
return (EAttribute)getResource().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Type() {
return (EAttribute)getResource().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_IsNull() {
return (EAttribute)getResource().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Initials() {
return (EAttribute)getResource().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Phonetics() {
return (EAttribute)getResource().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_NTAccount() {
return (EAttribute)getResource().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_MaterialLabel() {
return (EAttribute)getResource().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Code() {
return (EAttribute)getResource().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Group() {
return (EAttribute)getResource().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_WorkGroup() {
return (EAttribute)getResource().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_EmailAddress() {
return (EAttribute)getResource().getEStructuralFeatures().get(12);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Hyperlink() {
return (EAttribute)getResource().getEStructuralFeatures().get(13);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_HyperlinkAddress() {
return (EAttribute)getResource().getEStructuralFeatures().get(14);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_HyperlinkSubAddress() {
return (EAttribute)getResource().getEStructuralFeatures().get(15);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_MaxUnits() {
return (EAttribute)getResource().getEStructuralFeatures().get(16);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_PeakUnits() {
return (EAttribute)getResource().getEStructuralFeatures().get(17);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_OverAllocated() {
return (EAttribute)getResource().getEStructuralFeatures().get(18);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_AvailableFrom() {
return (EAttribute)getResource().getEStructuralFeatures().get(19);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_AvailableTo() {
return (EAttribute)getResource().getEStructuralFeatures().get(20);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Start() {
return (EAttribute)getResource().getEStructuralFeatures().get(21);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Finish() {
return (EAttribute)getResource().getEStructuralFeatures().get(22);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_CanLevel() {
return (EAttribute)getResource().getEStructuralFeatures().get(23);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_AccrueAt() {
return (EAttribute)getResource().getEStructuralFeatures().get(24);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Work() {
return (EAttribute)getResource().getEStructuralFeatures().get(25);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_RegularWork() {
return (EAttribute)getResource().getEStructuralFeatures().get(26);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_OvertimeWork() {
return (EAttribute)getResource().getEStructuralFeatures().get(27);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActualWork() {
return (EAttribute)getResource().getEStructuralFeatures().get(28);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_RemainingWork() {
return (EAttribute)getResource().getEStructuralFeatures().get(29);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActualOvertimeWork() {
return (EAttribute)getResource().getEStructuralFeatures().get(30);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_RemainingOvertimeWork() {
return (EAttribute)getResource().getEStructuralFeatures().get(31);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_PercentWorkComplete() {
return (EAttribute)getResource().getEStructuralFeatures().get(32);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_StandardRate() {
return (EAttribute)getResource().getEStructuralFeatures().get(33);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_StandardRateFormat() {
return (EAttribute)getResource().getEStructuralFeatures().get(34);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Cost() {
return (EAttribute)getResource().getEStructuralFeatures().get(35);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_OvertimeRate() {
return (EAttribute)getResource().getEStructuralFeatures().get(36);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_OvertimeRateFormat() {
return (EAttribute)getResource().getEStructuralFeatures().get(37);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_OvertimeCost() {
return (EAttribute)getResource().getEStructuralFeatures().get(38);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_CostPerUse() {
return (EAttribute)getResource().getEStructuralFeatures().get(39);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActualCost() {
return (EAttribute)getResource().getEStructuralFeatures().get(40);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActualOvertimeCost() {
return (EAttribute)getResource().getEStructuralFeatures().get(41);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_RemainingCost() {
return (EAttribute)getResource().getEStructuralFeatures().get(42);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_RemainingOvertimeCost() {
return (EAttribute)getResource().getEStructuralFeatures().get(43);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_WorkVariance() {
return (EAttribute)getResource().getEStructuralFeatures().get(44);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_CostVariance() {
return (EAttribute)getResource().getEStructuralFeatures().get(45);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_SV() {
return (EAttribute)getResource().getEStructuralFeatures().get(46);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_CV() {
return (EAttribute)getResource().getEStructuralFeatures().get(47);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ACWP() {
return (EAttribute)getResource().getEStructuralFeatures().get(48);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_CalendarUID() {
return (EAttribute)getResource().getEStructuralFeatures().get(49);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_Notes() {
return (EAttribute)getResource().getEStructuralFeatures().get(50);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_BCWS() {
return (EAttribute)getResource().getEStructuralFeatures().get(51);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_BCWP() {
return (EAttribute)getResource().getEStructuralFeatures().get(52);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_IsGeneric() {
return (EAttribute)getResource().getEStructuralFeatures().get(53);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_IsInactive() {
return (EAttribute)getResource().getEStructuralFeatures().get(54);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_IsEnterprise() {
return (EAttribute)getResource().getEStructuralFeatures().get(55);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_BookingType() {
return (EAttribute)getResource().getEStructuralFeatures().get(56);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActualWorkProtected() {
return (EAttribute)getResource().getEStructuralFeatures().get(57);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActualOvertimeWorkProtected() {
return (EAttribute)getResource().getEStructuralFeatures().get(58);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_ActiveDirectoryGUID() {
return (EAttribute)getResource().getEStructuralFeatures().get(59);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getResource_CreationDate() {
return (EAttribute)getResource().getEStructuralFeatures().get(60);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResource_ExtendedAttribute() {
return (EReference)getResource().getEStructuralFeatures().get(61);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResource_Baseline() {
return (EReference)getResource().getEStructuralFeatures().get(62);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResource_OutlineCode() {
return (EReference)getResource().getEStructuralFeatures().get(63);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResource_AvailabilityPeriods() {
return (EReference)getResource().getEStructuralFeatures().get(64);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResource_Rates() {
return (EReference)getResource().getEStructuralFeatures().get(65);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResource_TimephasedData() {
return (EReference)getResource().getEStructuralFeatures().get(66);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getResources() {
if (resourcesEClass == null) {
resourcesEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(87);
}
return resourcesEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getResources_Resource() {
return (EReference)getResources().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getTask() {
if (taskEClass == null) {
taskEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(93);
}
return taskEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_UID() {
return (EAttribute)getTask().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ID() {
return (EAttribute)getTask().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Name() {
return (EAttribute)getTask().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Type() {
return (EAttribute)getTask().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_IsNull() {
return (EAttribute)getTask().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_CreateDate() {
return (EAttribute)getTask().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Contact() {
return (EAttribute)getTask().getEStructuralFeatures().get(6);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_WBS() {
return (EAttribute)getTask().getEStructuralFeatures().get(7);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_WBSLevel() {
return (EAttribute)getTask().getEStructuralFeatures().get(8);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_OutlineNumber() {
return (EAttribute)getTask().getEStructuralFeatures().get(9);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_OutlineLevel() {
return (EAttribute)getTask().getEStructuralFeatures().get(10);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Priority() {
return (EAttribute)getTask().getEStructuralFeatures().get(11);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Start() {
return (EAttribute)getTask().getEStructuralFeatures().get(12);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Finish() {
return (EAttribute)getTask().getEStructuralFeatures().get(13);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Duration() {
return (EAttribute)getTask().getEStructuralFeatures().get(14);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_DurationFormat() {
return (EAttribute)getTask().getEStructuralFeatures().get(15);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Work() {
return (EAttribute)getTask().getEStructuralFeatures().get(16);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Stop() {
return (EAttribute)getTask().getEStructuralFeatures().get(17);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Resume() {
return (EAttribute)getTask().getEStructuralFeatures().get(18);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ResumeValid() {
return (EAttribute)getTask().getEStructuralFeatures().get(19);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_EffortDriven() {
return (EAttribute)getTask().getEStructuralFeatures().get(20);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Recurring() {
return (EAttribute)getTask().getEStructuralFeatures().get(21);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_OverAllocated() {
return (EAttribute)getTask().getEStructuralFeatures().get(22);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Estimated() {
return (EAttribute)getTask().getEStructuralFeatures().get(23);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Milestone() {
return (EAttribute)getTask().getEStructuralFeatures().get(24);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Summary() {
return (EAttribute)getTask().getEStructuralFeatures().get(25);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Critical() {
return (EAttribute)getTask().getEStructuralFeatures().get(26);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_IsSubproject() {
return (EAttribute)getTask().getEStructuralFeatures().get(27);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_IsSubprojectReadOnly() {
return (EAttribute)getTask().getEStructuralFeatures().get(28);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_SubprojectName() {
return (EAttribute)getTask().getEStructuralFeatures().get(29);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ExternalTask() {
return (EAttribute)getTask().getEStructuralFeatures().get(30);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ExternalTaskProject() {
return (EAttribute)getTask().getEStructuralFeatures().get(31);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_EarlyStart() {
return (EAttribute)getTask().getEStructuralFeatures().get(32);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_EarlyFinish() {
return (EAttribute)getTask().getEStructuralFeatures().get(33);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_LateStart() {
return (EAttribute)getTask().getEStructuralFeatures().get(34);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_LateFinish() {
return (EAttribute)getTask().getEStructuralFeatures().get(35);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_StartVariance() {
return (EAttribute)getTask().getEStructuralFeatures().get(36);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_FinishVariance() {
return (EAttribute)getTask().getEStructuralFeatures().get(37);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_WorkVariance() {
return (EAttribute)getTask().getEStructuralFeatures().get(38);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_FreeSlack() {
return (EAttribute)getTask().getEStructuralFeatures().get(39);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_TotalSlack() {
return (EAttribute)getTask().getEStructuralFeatures().get(40);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_FixedCost() {
return (EAttribute)getTask().getEStructuralFeatures().get(41);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_FixedCostAccrual() {
return (EAttribute)getTask().getEStructuralFeatures().get(42);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_PercentComplete() {
return (EAttribute)getTask().getEStructuralFeatures().get(43);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_PercentWorkComplete() {
return (EAttribute)getTask().getEStructuralFeatures().get(44);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Cost() {
return (EAttribute)getTask().getEStructuralFeatures().get(45);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_OvertimeCost() {
return (EAttribute)getTask().getEStructuralFeatures().get(46);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_OvertimeWork() {
return (EAttribute)getTask().getEStructuralFeatures().get(47);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualStart() {
return (EAttribute)getTask().getEStructuralFeatures().get(48);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualFinish() {
return (EAttribute)getTask().getEStructuralFeatures().get(49);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualDuration() {
return (EAttribute)getTask().getEStructuralFeatures().get(50);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualCost() {
return (EAttribute)getTask().getEStructuralFeatures().get(51);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualOvertimeCost() {
return (EAttribute)getTask().getEStructuralFeatures().get(52);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualWork() {
return (EAttribute)getTask().getEStructuralFeatures().get(53);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualOvertimeWork() {
return (EAttribute)getTask().getEStructuralFeatures().get(54);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_RegularWork() {
return (EAttribute)getTask().getEStructuralFeatures().get(55);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_RemainingDuration() {
return (EAttribute)getTask().getEStructuralFeatures().get(56);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_RemainingCost() {
return (EAttribute)getTask().getEStructuralFeatures().get(57);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_RemainingWork() {
return (EAttribute)getTask().getEStructuralFeatures().get(58);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_RemainingOvertimeCost() {
return (EAttribute)getTask().getEStructuralFeatures().get(59);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_RemainingOvertimeWork() {
return (EAttribute)getTask().getEStructuralFeatures().get(60);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ACWP() {
return (EAttribute)getTask().getEStructuralFeatures().get(61);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_CV() {
return (EAttribute)getTask().getEStructuralFeatures().get(62);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ConstraintType() {
return (EAttribute)getTask().getEStructuralFeatures().get(63);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_CalendarUID() {
return (EAttribute)getTask().getEStructuralFeatures().get(64);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ConstraintDate() {
return (EAttribute)getTask().getEStructuralFeatures().get(65);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Deadline() {
return (EAttribute)getTask().getEStructuralFeatures().get(66);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_LevelAssignments() {
return (EAttribute)getTask().getEStructuralFeatures().get(67);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_LevelingCanSplit() {
return (EAttribute)getTask().getEStructuralFeatures().get(68);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_LevelingDelay() {
return (EAttribute)getTask().getEStructuralFeatures().get(69);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_LevelingDelayFormat() {
return (EAttribute)getTask().getEStructuralFeatures().get(70);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_PreLeveledStart() {
return (EAttribute)getTask().getEStructuralFeatures().get(71);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_PreLeveledFinish() {
return (EAttribute)getTask().getEStructuralFeatures().get(72);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Hyperlink() {
return (EAttribute)getTask().getEStructuralFeatures().get(73);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_HyperlinkAddress() {
return (EAttribute)getTask().getEStructuralFeatures().get(74);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_HyperlinkSubAddress() {
return (EAttribute)getTask().getEStructuralFeatures().get(75);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_IgnoreResourceCalendar() {
return (EAttribute)getTask().getEStructuralFeatures().get(76);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Notes() {
return (EAttribute)getTask().getEStructuralFeatures().get(77);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_HideBar() {
return (EAttribute)getTask().getEStructuralFeatures().get(78);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_Rollup() {
return (EAttribute)getTask().getEStructuralFeatures().get(79);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_BCWS() {
return (EAttribute)getTask().getEStructuralFeatures().get(80);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_BCWP() {
return (EAttribute)getTask().getEStructuralFeatures().get(81);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_PhysicalPercentComplete() {
return (EAttribute)getTask().getEStructuralFeatures().get(82);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_EarnedValueMethod() {
return (EAttribute)getTask().getEStructuralFeatures().get(83);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getTask_PredecessorLink() {
return (EReference)getTask().getEStructuralFeatures().get(84);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualWorkProtected() {
return (EAttribute)getTask().getEStructuralFeatures().get(85);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTask_ActualOvertimeWorkProtected() {
return (EAttribute)getTask().getEStructuralFeatures().get(86);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getTask_ExtendedAttribute() {
return (EReference)getTask().getEStructuralFeatures().get(87);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getTask_Baseline() {
return (EReference)getTask().getEStructuralFeatures().get(88);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getTask_OutlineCode() {
return (EReference)getTask().getEStructuralFeatures().get(89);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getTask_TimephasedData() {
return (EReference)getTask().getEStructuralFeatures().get(90);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getTasks() {
if (tasksEClass == null) {
tasksEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(94);
}
return tasksEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getTasks_Task() {
return (EReference)getTasks().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getTimePeriod() {
if (timePeriodEClass == null) {
timePeriodEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(95);
}
return timePeriodEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimePeriod_FromDate() {
return (EAttribute)getTimePeriod().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimePeriod_ToDate() {
return (EAttribute)getTimePeriod().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getTimephasedDataType() {
if (timephasedDataTypeEClass == null) {
timephasedDataTypeEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(96);
}
return timephasedDataTypeEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimephasedDataType_Type() {
return (EAttribute)getTimephasedDataType().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimephasedDataType_UID() {
return (EAttribute)getTimephasedDataType().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimephasedDataType_Start() {
return (EAttribute)getTimephasedDataType().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimephasedDataType_Finish() {
return (EAttribute)getTimephasedDataType().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimephasedDataType_Unit() {
return (EAttribute)getTimephasedDataType().getEStructuralFeatures().get(4);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getTimephasedDataType_Value() {
return (EAttribute)getTimephasedDataType().getEStructuralFeatures().get(5);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getValue() {
if (valueEClass == null) {
valueEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(106);
}
return valueEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue_ValueID() {
return (EAttribute)getValue().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue_ParentValueID() {
return (EAttribute)getValue().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue_Value() {
return (EAttribute)getValue().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue_Description() {
return (EAttribute)getValue().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getValue2() {
if (value2EClass == null) {
value2EClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(107);
}
return value2EClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue2_ID() {
return (EAttribute)getValue2().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue2_Value() {
return (EAttribute)getValue2().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValue2_Description() {
return (EAttribute)getValue2().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getValueList() {
if (valueListEClass == null) {
valueListEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(108);
}
return valueListEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getValueList_Value() {
return (EReference)getValueList().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getValues() {
if (valuesEClass == null) {
valuesEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(110);
}
return valuesEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getValues_Group() {
return (EAttribute)getValues().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getValues_Value() {
return (EReference)getValues().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getWBSMask() {
if (wbsMaskEClass == null) {
wbsMaskEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(111);
}
return wbsMaskEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMask_Level() {
return (EAttribute)getWBSMask().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMask_Type() {
return (EAttribute)getWBSMask().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMask_Length() {
return (EAttribute)getWBSMask().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMask_Separator() {
return (EAttribute)getWBSMask().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getWBSMasks() {
if (wbsMasksEClass == null) {
wbsMasksEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(112);
}
return wbsMasksEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMasks_VerifyUniqueCodes() {
return (EAttribute)getWBSMasks().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMasks_GenerateCodes() {
return (EAttribute)getWBSMasks().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWBSMasks_Prefix() {
return (EAttribute)getWBSMasks().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getWBSMasks_WBSMask() {
return (EReference)getWBSMasks().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getWeekDay() {
if (weekDayEClass == null) {
weekDayEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(113);
}
return weekDayEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWeekDay_DayType() {
return (EAttribute)getWeekDay().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWeekDay_DayWorking() {
return (EAttribute)getWeekDay().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getWeekDay_TimePeriod() {
return (EReference)getWeekDay().getEStructuralFeatures().get(2);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getWeekDay_WorkingTimes() {
return (EReference)getWeekDay().getEStructuralFeatures().get(3);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getWeekDays() {
if (weekDaysEClass == null) {
weekDaysEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(114);
}
return weekDaysEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getWeekDays_WeekDay() {
return (EReference)getWeekDays().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getWorkingTime() {
if (workingTimeEClass == null) {
workingTimeEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(119);
}
return workingTimeEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWorkingTime_FromTime() {
return (EAttribute)getWorkingTime().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EAttribute getWorkingTime_ToTime() {
return (EAttribute)getWorkingTime().getEStructuralFeatures().get(1);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EClass getWorkingTimes() {
if (workingTimesEClass == null) {
workingTimesEClass = (EClass)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(120);
}
return workingTimesEClass;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EReference getWorkingTimes_WorkingTime() {
return (EReference)getWorkingTimes().getEStructuralFeatures().get(0);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getAccrueAt() {
if (accrueAtEDataType == null) {
accrueAtEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(0);
}
return accrueAtEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getActiveDirectoryGUIDType() {
if (activeDirectoryGUIDTypeEDataType == null) {
activeDirectoryGUIDTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(1);
}
return activeDirectoryGUIDTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getAliasType() {
if (aliasTypeEDataType == null) {
aliasTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(2);
}
return aliasTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getAuthorType() {
if (authorTypeEDataType == null) {
authorTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(5);
}
return authorTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getBaselineForEarnedValueType() {
if (baselineForEarnedValueTypeEDataType == null) {
baselineForEarnedValueTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(11);
}
return baselineForEarnedValueTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getBookingTypeType() {
if (bookingTypeTypeEDataType == null) {
bookingTypeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(12);
}
return bookingTypeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getBookingTypeType1() {
if (bookingTypeType1EDataType == null) {
bookingTypeType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(13);
}
return bookingTypeType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCalculationTypeType() {
if (calculationTypeTypeEDataType == null) {
calculationTypeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(14);
}
return calculationTypeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCategoryType() {
if (categoryTypeEDataType == null) {
categoryTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(17);
}
return categoryTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCodeType() {
if (codeTypeEDataType == null) {
codeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(18);
}
return codeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCompanyType() {
if (companyTypeEDataType == null) {
companyTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(19);
}
return companyTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getConstraintTypeType() {
if (constraintTypeTypeEDataType == null) {
constraintTypeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(20);
}
return constraintTypeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getContactType() {
if (contactTypeEDataType == null) {
contactTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(21);
}
return contactTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCostRateTableType() {
if (costRateTableTypeEDataType == null) {
costRateTableTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(22);
}
return costRateTableTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCurrencySymbolPositionType() {
if (currencySymbolPositionTypeEDataType == null) {
currencySymbolPositionTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(23);
}
return currencySymbolPositionTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getCurrencySymbolType() {
if (currencySymbolTypeEDataType == null) {
currencySymbolTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(24);
}
return currencySymbolTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDayTypeType() {
if (dayTypeTypeEDataType == null) {
dayTypeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(25);
}
return dayTypeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDefaultFixedCostAccrualType() {
if (defaultFixedCostAccrualTypeEDataType == null) {
defaultFixedCostAccrualTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(26);
}
return defaultFixedCostAccrualTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDefaultTaskEVMethodType() {
if (defaultTaskEVMethodTypeEDataType == null) {
defaultTaskEVMethodTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(27);
}
return defaultTaskEVMethodTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDefaultTaskTypeType() {
if (defaultTaskTypeTypeEDataType == null) {
defaultTaskTypeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(28);
}
return defaultTaskTypeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDurationFormatType() {
if (durationFormatTypeEDataType == null) {
durationFormatTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(30);
}
return durationFormatTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDurationFormatType1() {
if (durationFormatType1EDataType == null) {
durationFormatType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(31);
}
return durationFormatType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDurationFormatType2() {
if (durationFormatType2EDataType == null) {
durationFormatType2EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(32);
}
return durationFormatType2EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDurationFormatType3() {
if (durationFormatType3EDataType == null) {
durationFormatType3EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(33);
}
return durationFormatType3EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDurationFormatType4() {
if (durationFormatType4EDataType == null) {
durationFormatType4EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(34);
}
return durationFormatType4EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getDurationFormatType5() {
if (durationFormatType5EDataType == null) {
durationFormatType5EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(35);
}
return durationFormatType5EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getEarnedValueMethodType() {
if (earnedValueMethodTypeEDataType == null) {
earnedValueMethodTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(36);
}
return earnedValueMethodTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getEarnedValueMethodType1() {
if (earnedValueMethodType1EDataType == null) {
earnedValueMethodType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(37);
}
return earnedValueMethodType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getEmailAddressType() {
if (emailAddressTypeEDataType == null) {
emailAddressTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(38);
}
return emailAddressTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getExternalTaskProjectType() {
if (externalTaskProjectTypeEDataType == null) {
externalTaskProjectTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(44);
}
return externalTaskProjectTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getFixedCostAccrualType() {
if (fixedCostAccrualTypeEDataType == null) {
fixedCostAccrualTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(45);
}
return fixedCostAccrualTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getFYStartDateType() {
if (fyStartDateTypeEDataType == null) {
fyStartDateTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(46);
}
return fyStartDateTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getGroupType() {
if (groupTypeEDataType == null) {
groupTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(47);
}
return groupTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkAddressType() {
if (hyperlinkAddressTypeEDataType == null) {
hyperlinkAddressTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(48);
}
return hyperlinkAddressTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkAddressType1() {
if (hyperlinkAddressType1EDataType == null) {
hyperlinkAddressType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(49);
}
return hyperlinkAddressType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkAddressType2() {
if (hyperlinkAddressType2EDataType == null) {
hyperlinkAddressType2EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(50);
}
return hyperlinkAddressType2EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkSubAddressType() {
if (hyperlinkSubAddressTypeEDataType == null) {
hyperlinkSubAddressTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(51);
}
return hyperlinkSubAddressTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkSubAddressType1() {
if (hyperlinkSubAddressType1EDataType == null) {
hyperlinkSubAddressType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(52);
}
return hyperlinkSubAddressType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkSubAddressType2() {
if (hyperlinkSubAddressType2EDataType == null) {
hyperlinkSubAddressType2EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(53);
}
return hyperlinkSubAddressType2EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkType() {
if (hyperlinkTypeEDataType == null) {
hyperlinkTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(54);
}
return hyperlinkTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkType1() {
if (hyperlinkType1EDataType == null) {
hyperlinkType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(55);
}
return hyperlinkType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getHyperlinkType2() {
if (hyperlinkType2EDataType == null) {
hyperlinkType2EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(56);
}
return hyperlinkType2EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getInitialsType() {
if (initialsTypeEDataType == null) {
initialsTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(57);
}
return initialsTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getLagFormatType() {
if (lagFormatTypeEDataType == null) {
lagFormatTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(58);
}
return lagFormatTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getLevelingDelayFormatType() {
if (levelingDelayFormatTypeEDataType == null) {
levelingDelayFormatTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(59);
}
return levelingDelayFormatTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getLevelingDelayFormatType1() {
if (levelingDelayFormatType1EDataType == null) {
levelingDelayFormatType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(60);
}
return levelingDelayFormatType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getManagerType() {
if (managerTypeEDataType == null) {
managerTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(61);
}
return managerTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getMaterialLabelType() {
if (materialLabelTypeEDataType == null) {
materialLabelTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(64);
}
return materialLabelTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getNameType() {
if (nameTypeEDataType == null) {
nameTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(65);
}
return nameTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getNameType1() {
if (nameType1EDataType == null) {
nameType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(66);
}
return nameType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getNameType2() {
if (nameType2EDataType == null) {
nameType2EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(67);
}
return nameType2EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getNameType3() {
if (nameType3EDataType == null) {
nameType3EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(68);
}
return nameType3EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getNewTaskStartDateType() {
if (newTaskStartDateTypeEDataType == null) {
newTaskStartDateTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(69);
}
return newTaskStartDateTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getNTAccountType() {
if (ntAccountTypeEDataType == null) {
ntAccountTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(70);
}
return ntAccountTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getOutlineNumberType() {
if (outlineNumberTypeEDataType == null) {
outlineNumberTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(75);
}
return outlineNumberTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getOvertimeRateFormatType() {
if (overtimeRateFormatTypeEDataType == null) {
overtimeRateFormatTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(76);
}
return overtimeRateFormatTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getOvertimeRateFormatType1() {
if (overtimeRateFormatType1EDataType == null) {
overtimeRateFormatType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(77);
}
return overtimeRateFormatType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getPhoneticAliasType() {
if (phoneticAliasTypeEDataType == null) {
phoneticAliasTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(78);
}
return phoneticAliasTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getPhoneticsType() {
if (phoneticsTypeEDataType == null) {
phoneticsTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(79);
}
return phoneticsTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getPrefixType() {
if (prefixTypeEDataType == null) {
prefixTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(81);
}
return prefixTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getRateTableType() {
if (rateTableTypeEDataType == null) {
rateTableTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(85);
}
return rateTableTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getRollupTypeType() {
if (rollupTypeTypeEDataType == null) {
rollupTypeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(88);
}
return rollupTypeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getStandardRateFormatType() {
if (standardRateFormatTypeEDataType == null) {
standardRateFormatTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(89);
}
return standardRateFormatTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getStandardRateFormatType1() {
if (standardRateFormatType1EDataType == null) {
standardRateFormatType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(90);
}
return standardRateFormatType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getSubjectType() {
if (subjectTypeEDataType == null) {
subjectTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(91);
}
return subjectTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getSubprojectNameType() {
if (subprojectNameTypeEDataType == null) {
subprojectNameTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(92);
}
return subprojectNameTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTitleType() {
if (titleTypeEDataType == null) {
titleTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(97);
}
return titleTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTypeType() {
if (typeTypeEDataType == null) {
typeTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(98);
}
return typeTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTypeType1() {
if (typeType1EDataType == null) {
typeType1EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(99);
}
return typeType1EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTypeType2() {
if (typeType2EDataType == null) {
typeType2EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(100);
}
return typeType2EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTypeType3() {
if (typeType3EDataType == null) {
typeType3EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(101);
}
return typeType3EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTypeType4() {
if (typeType4EDataType == null) {
typeType4EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(102);
}
return typeType4EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getTypeType5() {
if (typeType5EDataType == null) {
typeType5EDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(103);
}
return typeType5EDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getUIDType() {
if (uidTypeEDataType == null) {
uidTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(104);
}
return uidTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getUnitType() {
if (unitTypeEDataType == null) {
unitTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(105);
}
return unitTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getValuelistSortOrderType() {
if (valuelistSortOrderTypeEDataType == null) {
valuelistSortOrderTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(109);
}
return valuelistSortOrderTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getWeekStartDayType() {
if (weekStartDayTypeEDataType == null) {
weekStartDayTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(115);
}
return weekStartDayTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getWorkContourType() {
if (workContourTypeEDataType == null) {
workContourTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(116);
}
return workContourTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getWorkFormatType() {
if (workFormatTypeEDataType == null) {
workFormatTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(117);
}
return workFormatTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public EDataType getWorkGroupType() {
if (workGroupTypeEDataType == null) {
workGroupTypeEDataType = (EDataType)EPackage.Registry.INSTANCE.getEPackage(MsprojectPackage.eNS_URI).getEClassifiers().get(118);
}
return workGroupTypeEDataType;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public MsprojectFactory getMsprojectFactory() {
return (MsprojectFactory)getEFactoryInstance();
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private boolean isLoaded = false;
/**
* Laods the package and any sub-packages from their serialized form.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void loadPackage() {
if (isLoaded) return;
isLoaded = true;
URL url = getClass().getResource(packageFilename);
if (url == null) {
throw new RuntimeException("Missing serialized package: " + packageFilename);
}
Resource resource = new EcoreResourceFactoryImpl().createResource(URI.createURI(url.toString()));
try {
resource.load(null);
}
catch (IOException exception) {
throw new WrappedException(exception);
}
initializeFromLoadedEPackage(this, (EPackage)resource.getContents().get(0));
createResource(eNS_URI);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
private boolean isFixed = false;
/**
* Fixes up the loaded package, to make it appear as if it had been programmatically built.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void fixPackageContents() {
if (isFixed) return;
isFixed = true;
fixEClassifiers();
}
} //MsprojectPackageImpl