/*******************************************************************************
* Copyright (c) 2005, 2009 IBM Corporation and others.
* All rights reserved. This program and the accompanying materials
* are made available under the terms of the Eclipse Public License v1.0
* which accompanies this distribution, and is available at
* http://www.eclipse.org/legal/epl-v10.html
*
* Contributors:
* IBM Corporation - initial implementation
*******************************************************************************/
package org.eclipse.epf.msproject.impl;
import java.math.BigInteger;
import org.eclipse.emf.common.notify.Notification;
import org.eclipse.emf.ecore.EClass;
import org.eclipse.emf.ecore.EStructuralFeature;
import org.eclipse.emf.ecore.impl.ENotificationImpl;
import org.eclipse.emf.ecore.impl.EObjectImpl;
import org.eclipse.epf.msproject.Baseline2;
import org.eclipse.epf.msproject.MsprojectPackage;
/**
* <!-- begin-user-doc -->
* An implementation of the model object '<em><b>Baseline2</b></em>'.
* <!-- end-user-doc -->
* <p>
* The following features are implemented:
* <ul>
* <li>{@link org.eclipse.epf.msproject.impl.Baseline2Impl#getNumber <em>Number</em>}</li>
* <li>{@link org.eclipse.epf.msproject.impl.Baseline2Impl#getWork <em>Work</em>}</li>
* <li>{@link org.eclipse.epf.msproject.impl.Baseline2Impl#getCost <em>Cost</em>}</li>
* <li>{@link org.eclipse.epf.msproject.impl.Baseline2Impl#getBCWS <em>BCWS</em>}</li>
* <li>{@link org.eclipse.epf.msproject.impl.Baseline2Impl#getBCWP <em>BCWP</em>}</li>
* </ul>
* </p>
*
* @generated
*/
public class Baseline2Impl extends EObjectImpl implements Baseline2 {
/**
* The default value of the '{@link #getNumber() <em>Number</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getNumber()
* @generated
* @ordered
*/
protected static final BigInteger NUMBER_EDEFAULT = null;
/**
* The cached value of the '{@link #getNumber() <em>Number</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getNumber()
* @generated
* @ordered
*/
protected BigInteger number = NUMBER_EDEFAULT;
/**
* The default value of the '{@link #getWork() <em>Work</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getWork()
* @generated
* @ordered
*/
protected static final Object WORK_EDEFAULT = null;
/**
* The cached value of the '{@link #getWork() <em>Work</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getWork()
* @generated
* @ordered
*/
protected Object work = WORK_EDEFAULT;
/**
* The default value of the '{@link #getCost() <em>Cost</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getCost()
* @generated
* @ordered
*/
protected static final float COST_EDEFAULT = 0.0F;
/**
* The cached value of the '{@link #getCost() <em>Cost</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getCost()
* @generated
* @ordered
*/
protected float cost = COST_EDEFAULT;
/**
* This is true if the Cost attribute has been set.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
protected boolean costESet = false;
/**
* The default value of the '{@link #getBCWS() <em>BCWS</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getBCWS()
* @generated
* @ordered
*/
protected static final float BCWS_EDEFAULT = 0.0F;
/**
* The cached value of the '{@link #getBCWS() <em>BCWS</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getBCWS()
* @generated
* @ordered
*/
protected float bCWS = BCWS_EDEFAULT;
/**
* This is true if the BCWS attribute has been set.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
protected boolean bCWSESet = false;
/**
* The default value of the '{@link #getBCWP() <em>BCWP</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getBCWP()
* @generated
* @ordered
*/
protected static final float BCWP_EDEFAULT = 0.0F;
/**
* The cached value of the '{@link #getBCWP() <em>BCWP</em>}' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see #getBCWP()
* @generated
* @ordered
*/
protected float bCWP = BCWP_EDEFAULT;
/**
* This is true if the BCWP attribute has been set.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
protected boolean bCWPESet = false;
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
protected Baseline2Impl() {
super();
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
protected EClass eStaticClass() {
return MsprojectPackage.eINSTANCE.getBaseline2();
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public BigInteger getNumber() {
return number;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void setNumber(BigInteger newNumber) {
BigInteger oldNumber = number;
number = newNumber;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.SET, MsprojectPackage.BASELINE2__NUMBER, oldNumber, number));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public Object getWork() {
return work;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void setWork(Object newWork) {
Object oldWork = work;
work = newWork;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.SET, MsprojectPackage.BASELINE2__WORK, oldWork, work));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public float getCost() {
return cost;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void setCost(float newCost) {
float oldCost = cost;
cost = newCost;
boolean oldCostESet = costESet;
costESet = true;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.SET, MsprojectPackage.BASELINE2__COST, oldCost, cost, !oldCostESet));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void unsetCost() {
float oldCost = cost;
boolean oldCostESet = costESet;
cost = COST_EDEFAULT;
costESet = false;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.UNSET, MsprojectPackage.BASELINE2__COST, oldCost, COST_EDEFAULT, oldCostESet));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public boolean isSetCost() {
return costESet;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public float getBCWS() {
return bCWS;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void setBCWS(float newBCWS) {
float oldBCWS = bCWS;
bCWS = newBCWS;
boolean oldBCWSESet = bCWSESet;
bCWSESet = true;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.SET, MsprojectPackage.BASELINE2__BCWS, oldBCWS, bCWS, !oldBCWSESet));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void unsetBCWS() {
float oldBCWS = bCWS;
boolean oldBCWSESet = bCWSESet;
bCWS = BCWS_EDEFAULT;
bCWSESet = false;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.UNSET, MsprojectPackage.BASELINE2__BCWS, oldBCWS, BCWS_EDEFAULT, oldBCWSESet));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public boolean isSetBCWS() {
return bCWSESet;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public float getBCWP() {
return bCWP;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void setBCWP(float newBCWP) {
float oldBCWP = bCWP;
bCWP = newBCWP;
boolean oldBCWPESet = bCWPESet;
bCWPESet = true;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.SET, MsprojectPackage.BASELINE2__BCWP, oldBCWP, bCWP, !oldBCWPESet));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void unsetBCWP() {
float oldBCWP = bCWP;
boolean oldBCWPESet = bCWPESet;
bCWP = BCWP_EDEFAULT;
bCWPESet = false;
if (eNotificationRequired())
eNotify(new ENotificationImpl(this, Notification.UNSET, MsprojectPackage.BASELINE2__BCWP, oldBCWP, BCWP_EDEFAULT, oldBCWPESet));
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public boolean isSetBCWP() {
return bCWPESet;
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public Object eGet(EStructuralFeature eFeature, boolean resolve) {
switch (eDerivedStructuralFeatureID(eFeature)) {
case MsprojectPackage.BASELINE2__NUMBER:
return getNumber();
case MsprojectPackage.BASELINE2__WORK:
return getWork();
case MsprojectPackage.BASELINE2__COST:
return new Float(getCost());
case MsprojectPackage.BASELINE2__BCWS:
return new Float(getBCWS());
case MsprojectPackage.BASELINE2__BCWP:
return new Float(getBCWP());
}
return eDynamicGet(eFeature, resolve);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void eSet(EStructuralFeature eFeature, Object newValue) {
switch (eDerivedStructuralFeatureID(eFeature)) {
case MsprojectPackage.BASELINE2__NUMBER:
setNumber((BigInteger)newValue);
return;
case MsprojectPackage.BASELINE2__WORK:
setWork((Object)newValue);
return;
case MsprojectPackage.BASELINE2__COST:
setCost(((Float)newValue).floatValue());
return;
case MsprojectPackage.BASELINE2__BCWS:
setBCWS(((Float)newValue).floatValue());
return;
case MsprojectPackage.BASELINE2__BCWP:
setBCWP(((Float)newValue).floatValue());
return;
}
eDynamicSet(eFeature, newValue);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public void eUnset(EStructuralFeature eFeature) {
switch (eDerivedStructuralFeatureID(eFeature)) {
case MsprojectPackage.BASELINE2__NUMBER:
setNumber(NUMBER_EDEFAULT);
return;
case MsprojectPackage.BASELINE2__WORK:
setWork(WORK_EDEFAULT);
return;
case MsprojectPackage.BASELINE2__COST:
unsetCost();
return;
case MsprojectPackage.BASELINE2__BCWS:
unsetBCWS();
return;
case MsprojectPackage.BASELINE2__BCWP:
unsetBCWP();
return;
}
eDynamicUnset(eFeature);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public boolean eIsSet(EStructuralFeature eFeature) {
switch (eDerivedStructuralFeatureID(eFeature)) {
case MsprojectPackage.BASELINE2__NUMBER:
return NUMBER_EDEFAULT == null ? number != null : !NUMBER_EDEFAULT.equals(number);
case MsprojectPackage.BASELINE2__WORK:
return WORK_EDEFAULT == null ? work != null : !WORK_EDEFAULT.equals(work);
case MsprojectPackage.BASELINE2__COST:
return isSetCost();
case MsprojectPackage.BASELINE2__BCWS:
return isSetBCWS();
case MsprojectPackage.BASELINE2__BCWP:
return isSetBCWP();
}
return eDynamicIsSet(eFeature);
}
/**
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
public String toString() {
if (eIsProxy()) return super.toString();
StringBuffer result = new StringBuffer(super.toString());
result.append(" (number: ");
result.append(number);
result.append(", work: ");
result.append(work);
result.append(", cost: ");
if (costESet) result.append(cost); else result.append("<unset>");
result.append(", bCWS: ");
if (bCWSESet) result.append(bCWS); else result.append("<unset>");
result.append(", bCWP: ");
if (bCWPESet) result.append(bCWP); else result.append("<unset>");
result.append(')');
return result.toString();
}
} //Baseline2Impl